Page 1 of 1

Process from Quenched to Loaded? [Answered]

PostPosted: Mon Jun 18, 2007 2:57 pm
by Sparqs
Several days ago 5 maps changed status from [Final Forge] to [Quenched]. I assumed they would be loaded shortly, but several days have passed and not only are they not loaded, but their threads are not filled with questions of when they will be. I looked at recently loaded maps and saw that they took a week or more to be loaded.

What process do maps go through after being Quenched? They must get added to the db, which make me wonder if it is an issue with the site update process and the way it interrupts service - is the delay so that more changes can be gathered and pushed through at once, thereby reducing update frequency? And since new XML has been implemented and is present in some of these maps, is there someone (or a beta team) who tests that?

PostPosted: Mon Jun 18, 2007 4:10 pm
by I GOT SERVED
lack needs to give them a test run and make sure everything works swimmingly.

Also, he needs to decide whether to veto the map or not.

PostPosted: Mon Jun 18, 2007 4:51 pm
by RobinJ
Aye - don't be so impatient! :lol: These things take time. As for the veto - I doubt it - don't think it has ever happened before

PostPosted: Mon Jun 18, 2007 5:24 pm
by DiM
if i'm not mistaking lack was on vacation when the maps got quenched plus being 5 maps it takes some time to properly test them. hopefully we'll have them soon. :roll:

after looking through some of the older quenched maps i saw that 8 thoughts was loaded in 2 days (actually the map sat with quench status for 10 days but since lack was on vacation until may 8th and the map was loaded on may 10th i assumed there were 2 days) while CCC took 8 days to load. so given lack's vacation and the fact there are 5 maps i'd say we'll have them somwhere in the weekend. even though i hope sooner.